Blog

Reading for owners on a GMP contract.

One hundred ten articles on the inside of the guaranteed maximum price: the two contingency funds, the cause on every change, buyout and shared savings, and the report the board and the lender read. Written for the party that signs, not the party that builds.

GMP contracts

How a guaranteed maximum price contract works from the owner's side, and where the money moves inside it.

GMP contractsUnit prices and alternates inside a GMP: what the owner should record before they are usedA GMP carries unit prices for uncertain quantities and alternates the owner may accept later. What to record so the rule is applied as written.Sep 9, 2026 · 5 minGMP contractsThe GMP in its last month: what moves in the weeks before substantial completionThe last month before substantial completion brings the final change orders, the last allowances and the first savings figure. What to settle first.Sep 2, 2026 · 5 minGMP contractsSelf-performed work inside a GMP: how the owner reads a package the contractor gave itselfWhen the CM performs a trade with its own crews, the package is never bid. What the owner asks for, and how the ledger treats the line.Aug 27, 2026 · 5 minGMP contractsThe GMP amendment's exhibits: which pages the owner's ledger is built fromA GMP amendment is a short document with long exhibits. Which exhibit feeds which register, and what to copy out before the first pay application arrives.Aug 21, 2026 · 6 minGMP contractsWhat a GMP contract is, read from the owner's sideThe GMP is a ceiling, not a price. This post explains what moves underneath it and what an owner should keep a record of from the first pay application.Aug 20, 2026 · 4 minGMP contractsCM at risk versus design bid build: what changes for the ownerUnder design bid build the owner buys a price. Under CM at risk the owner buys a process with a cap on it. Here is what that shift means for oversight.Aug 17, 2026 · 4 min

All 19 articles on gmp contracts

Contingency

Contractor contingency and owner contingency: who draws, who approves, and when the fund runs out.

All 18 articles on contingency

Change orders

Cause classification, notice deadlines, and the difference between owner scope and a design gap.

All 19 articles on change orders

Buyout and shared savings

What each package carried in the GMP, what it was bought for, and what is left to split at closeout.

Buyout and shared savingsPackages bought late in the job: what the last awards do to the savings poolFinishes and signage are bought last, into a market the GMP did not price. What late buyout does to the projected pool, and how to read the last awards.Sep 8, 2026 · 5 minBuyout and shared savingsShared savings when the GMP was amended: which ceiling the split is measured againstWhen change orders have raised the GMP, the savings clause has two ceilings to choose from. Which one applies, what it does to the pool, how to keep both.Sep 5, 2026 · 5 minBuyout and shared savingsAllowance or contingency: which fund a surprise should draw fromAn overrun can be charged to an allowance, to contractor contingency or to owner contingency. Three different closeouts. How to decide and record it.Aug 30, 2026 · 5 minBuyout and shared savingsScope gaps at buyout: when a package is awarded low because something was left outA trade package bought under its GMP line looks like a saving. Sometimes it is a gap that comes back as a change order. How the owner tells the two apart.Aug 24, 2026 · 5 minBuyout and shared savingsBuyout: what it is and why the owner should track it package by packageBuyout is the process of turning each estimated trade into a signed subcontract. Owners who track it by package know how much of the GMP is real.Apr 7, 2026 · 4 minBuyout and shared savingsBuyout savings: who owns them under a CM at risk contractWhen a package is bought under its GMP value, the saving has an owner. The contract decides who, and it often says so in three separate clauses.Apr 4, 2026 · 4 min

All 19 articles on buyout and shared savings

Owner reporting

Pay applications, anticipated final cost, and the monthly report the board and the lender read.

All 18 articles on owner reporting

By owner type

Developers, owner's representatives, school districts, universities and public agencies on CM at risk.

By owner typeCorporate owners building a headquarters: a one time owner on a GMP contractA company building its own headquarters has a CFO, an auditor and a board, and no construction department. What finance needs from the GMP record.Sep 1, 2026 · 5 minBy owner typeNonprofit owners: a board that reads the report once a quarterA nonprofit building once, with a volunteer board and a capital campaign behind the GMP. What the quarterly reader needs from the monthly record.Aug 26, 2026 · 5 minBy owner typeSchool district bond programs on CM at risk: what the board needs to see monthlyA bond program runs for years and the board reads one report a month. What that report should carry on a CM at risk contract, building by building.Jan 7, 2026 · 4 minBy owner typeUniversity capital projects: GMP oversight across several buildings at onceA capital projects office with five GMPs open and three project managers. How to keep each contract's contingency, changes and buyout on one consistent page.Jan 4, 2026 · 4 minBy owner typeDevelopers: how a GMP overrun reaches the equity waterfallA developer's hard cost overrun does not stop at the construction budget. It moves through the loan, the equity and the promote. Where to watch it early.Jan 1, 2026 · 4 minBy owner typeOwner's representatives: one ledger per owner, one portfolio view for youEach client owns their GMP record. The rep needs to see all of them at once without mixing them up. How to structure the books when you serve several owners.Dec 29, 2025 · 4 min

All 17 articles on by owner type

One next step

Read the ledger instead of the summary.

Thirty minutes on a call. We walk the nine modules on a fictional project at your GMP size.