Watch it work, screen by screen
Eleven short films of the same fictional project, recorded from the running application. No voice over, no music: the captions say what you are looking at. Start with the first one if you have ninety seconds, or take the module you argue about most.
Every screen here is the product rendering its own fictional project.
Nothing is requested from YouTube while you read this page. The films sit behind still frames taken from the films themselves and served from this site. Press one and only then does the film load, from youtube-nocookie.com, the variant that sets no advertising cookie unless you play it. We do not learn who watched what. Read the privacy page.
Where a GMP project stands, on one screen
The whole product in one pass: projects, dashboard, the nine registers, the report and the export.
1 min 30 s
Set up a GMP project from the amendment and the schedule of values
What happens between signing the GMP amendment and having a baseline nobody can quietly edit.
27 s
What does the owner's GMP baseline actually lock?
Every line carries a basis flag: priced, allowance or assumption. Changes are versioned with a reason.
29 s
Two contingency funds, two reasons they run empty
Owner contingency and construction contingency stay apart, each draw dated and supported.
30 s
A cause on every change, and a notice clock in days
Every change gets a cause first, and the cause decides which fund pays for it.
36 s
Every package against the GMP line it was carried at
What each package carried in the GMP, what it was actually bought for, and where the difference goes.
22 s
Allowances carried against what they actually cost
Carried value against actual cost, with the decision deadline on every allowance.
22 s
The number that matters more than the GMP
The GMP is a ceiling. This is the number the project is actually heading for, rebuilt on every entry.
23 s
What the shared savings clause actually pays out
The savings split read from your own contract terms, not from a rule of thumb.
21 s
One monthly report your board can read
The monthly owner report, the one page a board and a lender read, and every table out as structured data.
33 s
Questions kept with the project, not in an inbox
The document behind a draw, the question asked against a line, and who answered it.
28 s
Send us one pay application. We will check it.
One G703 with the names redacted. Six checks against the schedule of values it came from, and a written answer in two working days. No charge, and no follow up unless you ask for one.